Gary Tresenriter, City of Morrison, IL, Director of Public Works, submitted this message to residents on Friday, October 2, 2015.
“Very soon, construction will begin on E. Wall Street between IL Route 78 and S. Jackson Street, including south to the Pine Street intersection. The road work will consist of base repairs, followed by surface grinding, and finally overlaying 2¼” of blacktop.”
“Construction should last approximately three weeks. Please avoid this section of E. Wall Street if at all possible during construction. Please drive carefully in construction zones.”
Questions should be directed to Tresenriter at 815-772-7657.